SEWTEC AUTOMATION, WAKEFIELD

Refurbishment and subdivision of an existing warehouse with associated fit out works.

Works comprised the following;

  • Remodelling and refurbishment of the Main Reception Area and creation of Meeting Room Suite

  • Minor alteration, repair, redecoration and re-carpeting of the existing office accommodation at both Ground and First floor and installation of new viewing windows over the Production Area

  • Extension of the office accommodation over the existing storage area at Ground and First Floor

  • Construction of Production Office, QA facility and amenity block including staff WC, change and locker areas together with canteen.

  • Sub – division of the warehouse to create the assembly, machine and welding shop.

  • Alteration and extension of the existing gas fired warehouse heating to suit the subdivision and production use as opposed to warehouse use

  • Alteration of the existing warehouse lighting and provision of supplementary fittings to improve lux levels and suit the production use

  • Primary and Secondary Power Distribution and Feeds to the Production Areas

  • Installation of Compressor Air Distribution System to serve the Production Areas

  • Alteration and Extension of existing Door Access and Security Systems

  • Replacement of Data Cabling Systems and Cabinets.

  • Works to the yard including new foul drainage to serve the new amenity block, an external smoking shelter and compressor housing together with white lining to create additional car parking