top of page

NEW STUDENT HUB, UNIVERSITY OF LEEDS

Construction of a student hub to provide resident students with a communal space for socialising, study and fitness.

Works comprised of the following;

  • Relocation of EV charging point.

  • Excavate foundations for new retaining wall.

  • Construction of new retaining wall including brick & block work.

  • Casting new pad foundations including steel dowel bars.

  • Casting strip foundation for decking.

  • Formwork to form concrete pad stones.

  • Casting pad stones on top of pad foundations.

  • Installation of geotextile root barrier below building/decking area.

  • Installation of frame to receive decking.

  • Installation of duct work for new electrical services.

  • Installation of new drainage pipework and inspection chambers.

  • Installation of pipework for new water supply.

  • Erection of steelwork for new building.

  • Erection of building including fit-out.

  • Connection of services to building.

  • Groundworks including timber decking, pergola and timber seating to retaining wall.

  • Installation of new concrete cast entrance steps and install paving.

  • Construction of new external ramp and circulation area.

  • Installation of hazard paving to road edges / top & bottom of steps and ramp forming drop kerbs.

  • Tarmacking Works.

  • Construction of humped crossing to existing internal road.

  • Fitting balustarding to steps.

  • Landscaping.

  • Capping off new landscaped areas with 450mm top soil.

  • Capping off slopping areas with 150mm of top soil.

  • Laying grass turf to new sloping areas.

bottom of page