NEW STUDENT HUB, UNIVERSITY OF LEEDS
Construction of a student hub to provide resident students with a communal space for socialising, study and fitness.
Works comprised of the following;
Relocation of EV charging point.
Excavate foundations for new retaining wall.
Construction of new retaining wall including brick & block work.
Casting new pad foundations including steel dowel bars.
Casting strip foundation for decking.
Formwork to form concrete pad stones.
Casting pad stones on top of pad foundations.
Installation of geotextile root barrier below building/decking area.
Installation of frame to receive decking.
Installation of duct work for new electrical services.
Installation of new drainage pipework and inspection chambers.
Installation of pipework for new water supply.
Erection of steelwork for new building.
Erection of building including fit-out.
Connection of services to building.
Groundworks including timber decking, pergola and timber seating to retaining wall.
Installation of new concrete cast entrance steps and install paving.
Construction of new external ramp and circulation area.
Installation of hazard paving to road edges / top & bottom of steps and ramp forming drop kerbs.
Tarmacking Works.
Construction of humped crossing to existing internal road.
Fitting balustarding to steps.
Landscaping.
Capping off new landscaped areas with 450mm top soil.
Capping off slopping areas with 150mm of top soil.
Laying grass turf to new sloping areas.